
Platform · Energy
Power planned with the compute load
Solar generation, battery storage and distribution are specified as part of the facility — so energy is not an external afterthought to dense GPU demand.
On-site generation
Design intent includes a dedicated solar park sized with campus demand scenarios. Capacities remain indicative until engineering and permitting lock scope.
BESS buffering
Battery energy storage smooths intermittency and supports controlled duty cycles for compute. Storage is co-planned with power electronics and facility distribution.
Distribution and grid
Internal MV/LV distribution, redundancy and grid interconnection are part of the energy workstream. No assumption of unlimited public-grid capacity without diligence.
Procurement context
Power and BESS appear as indicative lots in the preparatory procurement notice. Listing a lot is not a live solicitation.